您的位置: HOME >NEWS >Company News

Telephone:

191-0555-5555

Safety preparation shall be done in advance for hoisting and transportation

作者:点击:2242 发布时间:2021-04-16

  During hoisting and transportation, it is necessary to check whether the construction operation, command and technical personnel are in place, whether the division of labor is clear, whether the hoisting environment (weather, wind, etc.) meets the requirements, whether the instrument interface and strain flange of equipment or components can be protected, and avoid or handle the lifting rigging and sharp parts of equipment or components.

  The connection between the equipment lifting point and the steel wire rope shall be firmly combined and confirmed. When the small crane has assistance, the lifting point shall be reasonably arranged, and the construction party shall be urged to carry out self inspection, re inspection and joint inspection with the construction party before lifting. All inspectors shall sign for confirmation, and the lifting test can be carried out after the safety inspection and confirmation of the lifting function personnel.

  In the hoisting test, it is necessary to carefully check and confirm the balance of the equipment components, the combined stability of the rigging, the load of the small crane, the lifting lug of the equipment or components, the rigging, the load of the small crane, the change of the foundation and the body and equipment of the lifting lug.

  In the process of equipment hoisting, all kinds of personnel in charge of management, command and operation should perform their duties and cooperate closely. The safety management engineer should carry out the site management throughout the whole process. I hope the above can help you.


关闭